Broad Cove Pump Station One Downer Avenue Our biggest station and main link with the MWRA, this station was built in 1956. This station handles flow from many area residences as well as almost all of our other stations. A new 100 KW diesel generator was installed in 1997.
Both existing pumps were rebuilt with new stuffing boxes and impellers and a new larger capacity 3rd pump was also installed at the same time that the electrical service was upgraded.
A new bubbler style liquid level controller replaced the float system. Several other electrical updates & upgrades were completed in recent years
 |
 |
 |
|
The Broad Cove Station |
The generator transfer switch and service disconnect |
Motors 2 & 3 in the foreground, the motor control center and emergency generator behind |
|
|
 |
 |
|
The 100KW emergency generator |
The motor control center |
Pumps 2 & 3 located 3 floors underground |
|
 |
 |
|
|
A view of the rose bushes that lines the front of the station along Rte. 3A |
The 3 pumps and piping located 3 floors underground |
|
|