|
Sewer Stations Operated and Maintained by the Hingham Sewer Department
Lewis Court Station located behind the DPW garage
The station was converted from a pnuematic station to a submersible station in 2002. Along with all new controls, a new natural gas generator was installed. This station operates witha submersible level probe which activates the pumps with the change in water levels
|
 |
|
|
The new wetwell completed up to grade |
The new power controls and emergency generator installed |
|
|
|
|
One of the dynamite blasts lifts the blasting mats off the ground prior to building the new station |
|
|